What we do
Citadel EHS surveys San Diego buildings for asbestos-containing materials before renovation or demolition. We inspect, sample suspect materials, send them to a laboratory and report what is there, where and in what condition.
We can continue with abatement design, bid documents, oversight of the abatement contractor and air monitoring and clearance. We do not perform abatement.
Our San Diego practice grew with Citadel’s 2026 integration of Aurora Industrial Hygiene, whose work for San Diego Unified School District is listed below.
Asbestos in San Diego buildings
The County Air Pollution Control District says buildings from before 1980 more commonly contain asbestos, and that buildings built after 1980 can too. Its Rule 1206 takes that seriously: the survey is required regardless of the age of the facility.
The rule is specific about what must be sampled. Suspect materials that will be removed, stripped or disturbed by the work must be sampled and analyzed. A copy of the survey must be on site for the duration of the work.
Our San Diego work includes school modernization. On those projects the survey comes first, then remediation oversight, and then air monitoring and clearance.
San Diego APCD and California requirements
These are the requirements that most often shape a San Diego project. Each links to its source.
San Diego APCD Rule 1206(d)(1) and (2)
Before renovation or demolition operations, and before the notification is submitted, a facility survey must be performed to determine the presence or absence of asbestos-containing material, regardless of the age of the facility. Suspect materials to be removed, stripped or disturbed must be sampled and analyzed. A complete copy must be kept on site for the duration of the work.
San Diego County APCD, Rule 1206San Diego APCD Rule 1206(d)(4)
People conducting facility surveys must have taken and passed a current EPA-approved Building Inspector Course.
San Diego County APCD, Rule 1206San Diego APCD Rule 1206(e)(5)
Notification forms must be submitted no later than 10 working days before the renovation or demolition begins. Work may begin on the eleventh day after 10 working days have passed from the effective date of the notification.
San Diego County APCD, Rule 1206San Diego APCD Rule 1206(b)
The rule does not apply to renovation disturbing less than 100 square feet of building materials in any consecutive 365-day period, nor to residential buildings of four or fewer dwelling units. Presuming suspect materials to be regulated asbestos-containing material and handling them that way removes the survey requirement.
San Diego County APCD, Rule 12068 CCR 341.6
An employer that engages in asbestos-related work involving 100 square feet or more of asbestos-containing construction material must apply for and obtain a registration from Cal/OSHA before starting. In this section, asbestos-containing construction material means a manufactured construction material containing more than one tenth of one percent asbestos by weight.
Cal/OSHA, 8 CCR 341.6
How a survey works
Step 1
Scope
You tell us the building and the planned work. We confirm which materials the work will remove, strip or disturb.
Step 2
Inspection
A trained inspector identifies suspect materials in the work area, grouped by type.
Step 3
Sampling
We sample the suspect materials the work will disturb and record each location and condition.
Step 4
Laboratory analysis
Samples go to a laboratory for asbestos analysis.
Step 5
Survey report
You receive the written survey, ready for the notification and to keep on site.
You receive a written survey with laboratory results and recommendations, ready to attach to the notification and to keep at the work site.
On the ground
Our San Diego office
3180 University Ave Suite 330
San Diego, CA 92104
(858) 463-8159
Based in San Diego
Who you will work with
Asbestos Testing in San Diego: common questions
- Does a newer building need a survey?
- Under Rule 1206, a facility survey is required regardless of the age of the facility, unless an exemption applies or suspect materials are presumed to be regulated asbestos-containing material.
- When is notification due?
- No later than 10 working days before the renovation or demolition begins. Work may begin on the eleventh day after the 10 working days have passed from the effective date of the notification.
- What about a small apartment building?
- Renovation or demolition at a residential building with four or fewer dwelling units is outside the rule, as long as it is not used for institutional, commercial, public or industrial purposes. Larger buildings are covered.
- Who can perform the survey?
- Rule 1206 says people conducting surveys must have taken and passed a current EPA-approved Building Inspector Course. California separately requires certification of asbestos consultants and site surveillance technicians.
- Have you worked on school projects?
- Yes. The project listed on this page is our work for San Diego Unified School District, which includes asbestos remediation oversight and clearance air sampling on campus modernization projects.
- Which office handles my project?
- San Diego and North San Diego together serve the county, including La Jolla, Carlsbad, Oceanside, Escondido, El Cajon and Chula Vista.