
California
Asbestos Testing & Surveys in California
Asbestos testing and building surveys for California owners and managers, with a clear view of which Cal/OSHA and air district rules apply to your project.
What we do
Citadel EHS surveys buildings for asbestos-containing materials before renovation, repair or demolition. We inspect, take bulk samples, send them to a laboratory and report what is there, where and in what condition.
Our building sciences group can go on to write the abatement design and bid documents, oversee the abatement contractor, and perform air monitoring and clearance. We do not perform the abatement.
California projects have a state layer and a district layer. This page covers both and says which district rule to check for your county.
How California’s asbestos rules fit together
Cal/OSHA applies everywhere in the state. It regulates worker protection, the certification of asbestos consultants and site surveillance technicians, and registration of contractors doing asbestos work above 100 square feet. It also puts duties on building owners before work starts.
The survey and notification rules for demolition and renovation depend on the air district. South Coast AQMD covers large areas of Los Angeles, Orange, Riverside and San Bernardino counties. The Bay Area Air Quality Management District covers the Bay Area. The San Diego County Air Pollution Control District covers San Diego County. Rules elsewhere in the state depend on the local district, and we confirm the district first.
The differences are practical. South Coast requires a survey that looks at all layers of flooring and wall cavities, with notice 10 working days ahead. The Bay Area exempts small residential buildings from the survey but not from sampling when certain materials are disturbed. San Diego requires a survey regardless of the building’s age.
Glendale, Valencia and Long Beach cover Los Angeles County, and Irvine covers Orange County. San Diego and North San Diego cover San Diego County. Walnut Creek covers the Bay Area and Grass Valley covers the Sierra foothills and the Sacramento area.
California and air district requirements
Cal/OSHA rules come first, followed by the three district rules we apply most often. Each links to its source. Check the district for your county before you plan.
8 CCR 1529(k)(2)
Before work subject to the Cal/OSHA construction asbestos standard begins, building and facility owners must determine the presence, location and quantity of asbestos-containing material at the work site, and notify prospective employers bidding on the work, the owner’s employees, other employers on the site and tenants who will occupy affected areas.
Cal/OSHA, 8 CCR 15298 CCR 1529(q)(4) and 341.15(a)
No employer may engage an asbestos consultant or site surveillance technician unless the person provides proof of Cal/OSHA certification. An individual who performs those services must apply for and obtain certification from Cal/OSHA.
Cal/OSHA, 8 CCR 341.158 CCR 341.6
An employer that engages in asbestos-related work involving 100 square feet or more of asbestos-containing construction material must apply for and obtain a registration from Cal/OSHA before starting.
Cal/OSHA, 8 CCR 341.6South Coast AQMD Rule 1403(d)(1)
Before any demolition or renovation, the affected facility must be thoroughly surveyed by a person certified by Cal/OSHA who has passed an EPA-approved Building Inspector Course. The survey must identify all affected materials, including all layers of flooring to the joist level and material in wall or ceiling cavities as necessary. The District must be notified no later than 10 working days before work begins, with the Rule 301 fee.
South Coast AQMD, Rule 1403BAAQMD Reg. 11-2-303.8 and 11-2-401.3
Except for ordered demolitions, the owner or operator must survey the affected structure before demolition or renovation. Residential buildings with four or fewer dwelling units need no survey, but sampling is required when HVAC ducting, acoustic ceiling material or plaster, textured or skim-coated wall surfaces, cement siding or stucco, or resilient flooring will be removed or disturbed. Written notification is due at least 10 working days before every demolition.
Bay Area AQMD, Regulation 11 Rule 2San Diego APCD Rule 1206(d)(1) and (e)(5)
Before renovation or demolition, a facility survey must be performed to determine the presence or absence of asbestos-containing material, regardless of the age of the facility. Notification forms must be submitted no later than 10 working days before the work begins.
San Diego APCD, Rule 1206
How a survey works
Step 1
Scope and district
You tell us the building, its location and the planned work. We confirm the air district and which exemptions apply.
Step 2
Inspection
A certified inspector walks the work area and lists suspect materials by type, including flooring layers and cavities that the work will open.
Step 3
Sampling
We collect bulk samples of suspect materials and record where each was taken and its condition.
Step 4
Laboratory analysis
Samples go to a laboratory for asbestos analysis and the results come back to us.
Step 5
Survey report
We deliver a report with the materials, samples, laboratory results and condition, ready to give to bidding contractors and to support the district notification.
You receive a written survey report with laboratory results and recommendations, ready to give to every bidding contractor and to support the district notification.
On the ground
Our Glendale office
1725 Victory Blvd
Glendale, CA 91201
(818) 246-2707
Based in Glendale
Who you will work with
Related projects

Los Angeles Unified School District
Since 2004, Citadel EHS has served as a long-term environmental and hazardous materials consultant to Los Angeles Unified School District (LAUSD), supporting K-12 facilities throughout the greater Los Angeles region. Across approximately 1000+ distinct project assignments, Citadel has provided asbestos and lead consulting, environmental sampling, project design, abatement oversight, air monitoring and clearance, technical reporting, and dedicated staff support for school modernization, infrastructure, technology, maintenance, and capital improvement programs.

Valley Presbyterian Hospital
Citadel EHS has served as the on-call environmental and hazardous materials consultant for Valley Presbyterian Hospital (VPH) for over 14 years, providing comprehensive Building Sciences and Industrial Hygiene services across the hospital's campus in Van Nuys, California.

Long Beach Civic Center
Citadel EHS provided comprehensive environmental, hazardous materials, industrial hygiene, and remediation consulting in support of the Long Beach Civic Center redevelopment in Long Beach, California. The project involved replacement and modernization of aging civic facilities, including City Hall, the Main Library, Lincoln Park, and surrounding site improvements.

San Diego Unified School District
Citadel EHS, through its integration with Aurora Industrial Hygiene, provides ongoing hazardous materials, industrial hygiene, and environmental consulting to San Diego Unified School District in support of school modernization, renovation, remediation, and facility improvement projects across the District’s K-12 portfolio. Our teams have supported elementary, charter, and high school campuses throughout San Diego, helping the District address environmental conditions while maintaining safe, compliant, and well-documented construction programs.

Santa Ana Civic Center Redevelopment
The Santa Ana Civic Center Redevelopment Program is transforming a significant portion of Orange County's government campus through the replacement of aging facilities with a modern mixed-use civic complex that will consolidate public services and include new event and conference facilities. The long-term redevelopment effort is being implemented in multiple phases and requires careful management of environmental risks associated with demolition and construction activities.
Asbestos Testing in California: common questions
- Does the survey rule differ between Los Angeles and San Francisco?
- Yes. Los Angeles falls under South Coast AQMD Rule 1403 and San Francisco under BAAQMD Regulation 11 Rule 2. Both require a survey before most renovations and demolitions, but the exemptions differ, notably for small residential buildings.
- Which agency regulates asbestos where I am?
- Cal/OSHA applies statewide. For demolition and renovation, the local air district sets the survey and notice rules. Tell us the property address and we will confirm which district applies.
- Who is allowed to do the survey?
- Rule 1403 and the Bay Area rule say survey personnel must be certified by Cal/OSHA and have passed an EPA-approved Building Inspector Course. San Diego requires the Building Inspector Course. Cal/OSHA also requires certification of asbestos consultants and site surveillance technicians.
- What do contractors need to be told?
- Under 8 CCR 1529(k), the owner must determine the presence, location and quantity of asbestos-containing material before the work and notify prospective employers who bid on it, along with employees and tenants who will be in or next to affected areas.
- How far ahead do I notify the air district?
- In South Coast and San Diego, notice is due no later than 10 working days before the work begins. In the Bay Area, written notice is due at least 10 working days before every demolition and before renovations above set thresholds. Emergency work and exemptions are treated differently, so confirm yours.
- Have you surveyed schools, hospitals and civic buildings?
- Yes. The projects listed on this page include asbestos work for school districts, a hospital and civic campuses in Los Angeles, Orange and San Diego counties.