
San Francisco Bay Area, CA
Asbestos Testing & Surveys in San Francisco & the Bay Area
Asbestos testing and building surveys for San Francisco and Bay Area owners and managers who need a survey that meets Air District and Cal/OSHA requirements.
What we do
Citadel EHS surveys buildings for asbestos-containing materials before renovation, repair or demolition. We inspect, collect bulk samples, send them to a laboratory and report what was found, where and in what condition.
Our building sciences group can also design the abatement, review bids, oversee the abatement contractor and perform air monitoring and clearance. We do not perform abatement.
Surveys are used before tenant improvements and renovations, before demolition, in due diligence on a building purchase, and after a leak or fire that may have disturbed suspect materials.
Asbestos in Bay Area buildings
In the Bay Area the Bay Area Air Quality Management District, not a county or city, regulates asbestos in demolition and renovation. Its rule, Regulation 11 Rule 2, sets the survey, the notification and the removal practices.
The rule treats small residential buildings differently from everything else. Residential buildings with four or fewer dwelling units have no survey requirement, but sampling and testing is required when certain materials are removed or disturbed. Offices, retail, mixed-use buildings and larger apartment buildings are surveyed before the work.
We apply the same discipline on every Bay Area survey: identify each suspect material, sample it, and name the laboratory and method so the Air District can see how the survey was done.
Bay Area Air District and California requirements
These are the requirements that most often shape a Bay Area project. Each links to its source.
BAAQMD Reg. 11-2-303.8
Except for ordered demolitions, the owner or operator must thoroughly survey the affected structure before any demolition or renovation, including Category I and II nonfriable asbestos-containing material. The surveyor must be certified by Cal/OSHA’s Division of Occupational Safety and Health and have passed an EPA-approved Building Inspector course. The survey includes laboratory analysis of all suspect materials.
Bay Area AQMD, Regulation 11 Rule 2BAAQMD Reg. 11-2-303.8.2
For renovation or demolition of residential buildings with four or fewer dwelling units a survey is not required. Sampling and testing is required only when HVAC ducting and systems, acoustic ceiling material or plaster, textured or skim-coated wall surfaces, cement siding or stucco, or resilient flooring will be removed or disturbed.
Bay Area AQMD, Regulation 11 Rule 2BAAQMD Reg. 11-2-401.3
A written notification must be given to the Air District at least 10 working days before every demolition, even where no regulated asbestos is present, and before each renovation involving at least 100 linear feet, 100 square feet or 35 cubic feet of regulated asbestos-containing material.
Bay Area AQMD, Regulation 11 Rule 28 CCR 1529(q)(4)
Under the Cal/OSHA construction asbestos standard, no employer may engage the services of an asbestos consultant or site surveillance technician unless the person provides proof of certification by the Division. “Asbestos consultant” covers building inspection, abatement design, sample collection, clearance monitoring and related work on 100 square feet or more of asbestos-containing construction material.
Cal/OSHA, 8 CCR 1529
How a survey works
Step 1
Scope
You tell us the building type, its age and the work planned. We confirm whether the residential exemption applies or a full survey is required.
Step 2
Inspection
A certified inspector identifies suspect materials in the work area, grouped by type.
Step 3
Sampling
We take bulk samples and record locations and condition.
Step 4
Laboratory analysis
Samples go to a laboratory for asbestos analysis.
Step 5
Survey report
The report lists materials sampled, results, quantities and condition, with the surveyor’s details the notification asks for.
You receive a written survey report with laboratory results, quantities and recommendations, ready for your contractors and for the Air District notification.
On the ground
Our Walnut Creek office
1371 Oakland Blvd Suite 100
Walnut Creek, CA 94596
(818) 246-2707
Asbestos Testing in San Francisco Bay Area: common questions
- Do I need an asbestos survey before renovating in San Francisco?
- In most cases yes. Regulation 11 Rule 2 requires a survey before any renovation or demolition, except for residential buildings of four or fewer dwelling units, where a survey is not required but sampling is required if certain materials are disturbed.
- How far ahead do I notify the Air District?
- Written notification is due at least 10 working days before demolition or before a renovation involving at least 100 linear feet, 100 square feet or 35 cubic feet of regulated asbestos-containing material. Small residential projects can use a shorter start period if the fee is paid.
- Can I assume asbestos is present and skip the survey?
- The rule’s survey section does not apply if the owner or operator asserts that the material to be renovated is regulated asbestos-containing material and handles it accordingly.
- Who can do the survey?
- A person certified by Cal/OSHA’s Division of Occupational Safety and Health who has passed an EPA-approved Building Inspector course. Cal/OSHA also requires employers to see proof of certification before engaging an asbestos consultant or site surveillance technician.
- How does the Bay Area differ from Los Angeles or San Diego?
- Each region has its own air district rule. Bay Area Regulation 11 Rule 2 has its own residential exemption and its own notification thresholds. Our Los Angeles and San Diego pages describe the South Coast and San Diego County rules.
- Which Bay Area cities do you serve?
- Our Walnut Creek office serves San Francisco, Oakland, Berkeley, Concord, Hayward, Richmond, Pleasanton, Livermore, San Ramon and Dublin, along with the East Bay and the Tri-Valley.