Asbestos Testing & Surveys in Oregon
Asbestos testing and building surveys for Oregon owners and managers who need a compliant survey before renovation or demolition.
What we do
Citadel EHS identifies asbestos-containing materials before work disturbs them. A survey inspects the building, collects bulk samples of suspect materials, sends them for laboratory analysis and reports what was found, where it is and what condition it is in.
The same team can design the abatement and write bid documents, then oversee the abatement contractor and perform air monitoring and clearance testing. We do not perform the abatement. Our building sciences group also surveys for lead, PCBs and other regulated materials in the same visit.
Surveys are used before renovation and demolition, when buying or leasing a building, and when a fire or a leak could have affected suspect materials.
How Oregon’s asbestos rules work
In Oregon the survey is a legal step, not a courtesy. DEQ administers the state asbestos program under OAR chapter 340, division 248, and the rules put duties on the owner or operator of the work, not only on the contractor.
The sequence is the same on every project. The owner or operator has an accredited inspector complete a survey before demolition or renovation. If asbestos is found, DEQ is notified before abatement begins, and a DEQ-licensed contractor with a certified supervisor does the removal. The survey report stays on site and DEQ can ask for a copy.
A bulk sample counts as asbestos-containing material under the DEQ definition when it contains more than one percent asbestos by weight. Most surveys turn on that laboratory result. No construction date rules asbestos out, so we sample flooring and mastics, joint compound, ceiling materials, pipe and duct insulation and roofing in older buildings regardless of age.
The rules do not change from city to city within DEQ’s program, but the work does. Portland has plenty of older buildings with crawlspaces and below-grade space. Our Portland office serves the Portland metro area and the Willamette Valley, including Salem and Eugene. Tell us the address and we will confirm which agency regulates the property.
Oregon DEQ requirements
Oregon’s asbestos rules are in OAR chapter 340, division 248. These are the requirements that most often shape a project.
OAR 340-248-0270(1)
Before performing a demolition or renovation, the owner or operator must have an accredited inspector complete an asbestos survey, except as the exemptions in OAR 340-248-0250 provide.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0270(2) and (3)
The survey must include a bulk sample of each homogeneous suspect material, laboratory analysis by a lab in a nationally recognized accreditation or proficiency program, and a written report. The owner or operator keeps the report on site and sends DEQ a copy on request.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0010
Oregon DEQ defines renovation to include replacing, stripping or repairing walls, ceilings and flooring.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0260
DEQ must receive written notification of an asbestos abatement project, with the fee, at least 10 days before a friable project begins and at least five days before a nonfriable project begins, unless an exemption applies.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0110
A contractor that performs an asbestos abatement project must be licensed by DEQ, and a certified supervisor must be present on the project, subject to the exemptions in OAR 340-248-0250.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0270(5)
If asbestos-containing material is discovered during demolition or renovation, the owner or operator must stop work immediately and keep the material wet and covered until a licensed abatement contractor begins removal.
Oregon DEQ asbestos rules, OAR 340-248
How a survey works
Step 1
Scope
You tell us the building, its location and age, and the work planned. We confirm which areas the survey has to cover.
Step 2
Inspection
An accredited inspector walks the planned work area and identifies suspect materials, grouped by type.
Step 3
Sampling
We collect bulk samples of each homogeneous suspect material, and record where each was taken and what condition it is in.
Step 4
Laboratory analysis
Samples go to a laboratory for asbestos analysis and the results come back to us.
Step 5
Survey report
We deliver a report listing the materials sampled, the laboratory results, the quantity and condition of any asbestos-containing material and recommended response actions.
You receive a written survey report with the laboratory results and recommendations, ready to hand to a designer or an abatement contractor and to keep on site.
On the ground
Our Portland office
1120 SE Madison Street
Portland, OR 97214
(818) 246-2707
Based in Portland
Who you will work with
Asbestos Testing in Oregon: common questions
- Do I need an asbestos survey before renovating in Oregon?
- Generally yes. OAR 340-248-0270 requires an accredited inspector’s survey before a demolition or renovation, with exemptions in OAR 340-248-0250 such as small removals of under three square feet or three linear feet (with conditions), and owner-occupied single-unit residences where the owner does the work. DEQ can also waive the survey case by case for a residential building of four or fewer units, on written request.
- What counts as asbestos-containing material in Oregon?
- Under the DEQ definition, a material containing more than one percent asbestos by weight. Results below that line are not asbestos-containing material under the rule.
- Who has to notify DEQ, and when?
- The owner or operator of the work, or the contractor, files written notification with the fee at least 10 days before a friable abatement project and five days before a nonfriable one. The notice is for abatement work, so the survey comes first and tells you whether you need it.
- Does the rule differ between Portland and Eugene?
- DEQ’s rules in OAR 340-248 are written for the state program, not for one city. Local agencies and permit offices may add their own requirements, which we have not covered here, so give us the address and we will confirm who regulates it.
- We found something suspect partway through a job. What now?
- Stop work. The rule requires work to stop immediately, with exposed material kept wet and covered until a licensed abatement contractor starts removal. Call us and we can sample and scope the response.
- Can the survey and the abatement oversight come from the same firm?
- Yes, and it often helps. We do not perform the abatement, so the firm that identified the material is not the one bidding to remove it.