
Portland, OR
Asbestos Testing & Surveys in Portland, OR
Asbestos testing and building surveys for Portland owners and managers who need a compliant survey before renovation or demolition.
What we do
Citadel EHS identifies asbestos-containing materials before work disturbs them. A survey inspects the building, collects bulk samples of suspect materials, sends them for laboratory analysis and reports what was found, where it is and what condition it is in.
The same team can design the abatement and write bid documents, then oversee the abatement contractor and perform air monitoring and clearance testing. Our building sciences group also surveys for lead, PCBs and other regulated materials in the same visit.
Surveys are used before renovation and demolition, when buying or leasing a building, and when damage from a fire or a leak could have affected suspect materials.
Asbestos in Portland buildings
Asbestos was used in a wide range of building products, and no construction date can be relied on to rule it out. In an older Portland building, the usual candidates are flooring and mastics, joint compound, ceiling materials, pipe and duct insulation and roofing.
In Oregon the survey is a legal step, not just a courtesy. DEQ administers the state asbestos program, and the rules put duties on the owner or operator of the work, not only on the contractor. That includes keeping the survey report on site and sending DEQ a copy on request.
A bulk sample counts as asbestos-containing material under the DEQ definition when it contains more than one percent asbestos by weight. Most surveys turn on that laboratory result.
Oregon DEQ requirements
Oregon’s asbestos rules are in OAR chapter 340, division 248. These are the requirements that most often shape a Portland project.
OAR 340-248-0270(1)
Before performing a demolition or renovation, the owner or operator must have an accredited inspector complete an asbestos survey, except as the exemptions in OAR 340-248-0250 provide.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0270(2) and (3)
The survey must include a bulk sample of each homogeneous suspect material, laboratory analysis by a lab in a nationally recognized accreditation or proficiency program, and a written report. The owner or operator keeps the report on site and sends DEQ a copy on request.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0260
DEQ must receive written notification of an asbestos abatement project, with the fee, at least 10 days before a friable project begins and at least five days before a nonfriable project begins, unless an exemption applies.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0110
A contractor that performs an asbestos abatement project must be licensed by DEQ, and a certified supervisor must be present on the project, subject to the exemptions in OAR 340-248-0250.
Oregon DEQ asbestos rules, OAR 340-248OAR 340-248-0270(5)
If asbestos-containing material is discovered during demolition or renovation, the owner or operator must stop work immediately and keep the material wet and covered until a licensed abatement contractor begins removal.
Oregon DEQ asbestos rules, OAR 340-248
How a survey works
Step 1
Scope
You tell us the building, its age and the work planned. We confirm which areas the survey has to cover.
Step 2
Inspection
An accredited inspector walks the planned work area and identifies suspect materials, grouped by type.
Step 3
Sampling
We collect bulk samples of each homogeneous suspect material, and record where each was taken and what condition it is in.
Step 4
Laboratory analysis
Samples go to a laboratory for asbestos analysis and the results come back to us.
Step 5
Survey report
We deliver a report listing the materials sampled, the laboratory results, the quantity and condition of any asbestos-containing material and recommended response actions.
You receive a written survey report with the laboratory results and recommendations, ready to hand to a designer or an abatement contractor and to keep on site.
On the ground
Our Portland office
1120 SE Madison Street
Portland, OR 97214
(818) 246-2707
Based in Portland
Who you will work with
Asbestos Testing in Portland: common questions
- Do I need an asbestos survey before renovating in Portland?
- Generally yes. OAR 340-248-0270 requires an accredited inspector’s survey before a demolition or renovation, with exemptions in OAR 340-248-0250 such as small removals of under three square feet or three linear feet (with conditions), and owner-occupied single-unit residences where the owner does the work. DEQ can also waive the survey case by case for a residential building of four or fewer units, on written request.
- What counts as asbestos-containing material in Oregon?
- Under the DEQ definition, a material containing more than one percent asbestos by weight. Results below that line are not asbestos-containing material under the rule.
- Who has to notify DEQ, and when?
- The owner or operator of the work, or the contractor, files written notification with the fee at least 10 days before a friable abatement project and five days before a nonfriable one. The notice is for abatement work, so the survey comes first and tells you whether you need it.
- We found something suspect partway through a job. What now?
- Stop work. The rule requires work to stop immediately, with exposed material kept wet and covered until a licensed abatement contractor starts removal. Call us and we can sample and scope the response.
- Do you also handle lead and other regulated materials?
- Yes. Our building sciences group surveys for asbestos, lead, PCBs and other hazardous materials, and can combine them into one survey for a renovation or demolition.
- Can the survey and the abatement oversight come from the same firm?
- Yes, and it often helps. We do not perform the abatement, so the firm that identified the material is not the one bidding to remove it.