Citadel EHS does not perform the tear-out. We write the remediation protocol, oversee the contractor who does the work, and verify the result with clearance testing.

Photo: Adam Blank / Unsplash

What we do, and what we don’t

To be direct: Citadel EHS does not do remediation labor. We do not remove drywall, build containment or bid the work. A remediation contractor does that.

What we do is the part that decides whether the job works. We assess the affected area and the moisture source, write the remediation protocol and scope, help you review contractor bids against it, oversee the work while it is under way, and perform post-remediation verification testing at the end.

Because we have no stake in the removal work, the scope is not padded and the clearance result is not self-graded. That independence from the contractor is the reason to hire us.

Why oversight matters in Portland

Wet Oregon winters mean a mold job that leaves the moisture source in place usually comes back. A protocol that names the source, the repair and the order of work keeps the remediation contractor and the plumbing or roofing trade from undoing each other.

When the same firm assesses, removes and then declares the space clean, the scope and the price come from one place. Splitting the roles gives you a written scope to price against and a clearance result from someone who did not do the work.

Older Portland buildings add a second issue. Removing walls, ceilings or flooring to reach mold can also disturb asbestos-containing materials, which is why the survey rule below matters before tear-out starts.

Guidance and rules that apply

There is no numeric mold limit to clear against, so remediation work follows published guidance. The asbestos survey rule applies to the demolition or renovation that remediation often involves.

  • EPA guidance for commercial buildings

    EPA’s guidance on mold remediation in schools and commercial buildings says to use outside professionals who have experience with mold cleanup, check their references, and have them follow EPA’s recommendations, ACGIH guidelines or other professional guidelines.

    EPA, Mold Remediation in Schools and Commercial Buildings, Chapter 1
  • ANSI/IICRC S520

    The ANSI/IICRC S520 standard describes the procedures and precautions for mold remediation in residential, commercial and institutional buildings. The fourth edition was published in 2024.

    IICRC, ANSI/IICRC S520
  • No standard for “safe” levels

    The Oregon Health Authority says there are no standards to judge “safe” levels of indoor mold. Clearance criteria therefore have to be written into the protocol before the work starts.

    Oregon Health Authority, Mold
  • OAR 340-248-0270 and 340-248-0010

    Before a demolition or renovation, the owner or operator must have an accredited inspector complete an asbestos survey, subject to the exemptions in OAR 340-248-0250. Oregon DEQ defines renovation to include replacing, stripping or repairing walls, ceilings and flooring.

    Oregon Administrative Rules, chapter 340, division 248

How a remediation project runs

  1. Step 1

    Assessment

    We inspect the affected area, identify the moisture source and decide how far the work needs to extend.

  2. Step 2

    Protocol and scope

    We write the remediation protocol: the work to be done, containment and cleaning requirements, and the criteria the space must meet before it is cleared.

  3. Step 3

    Contractor selection

    You send the protocol to the contractors you want to hear from. We help you compare their bids against the same scope.

  4. Step 4

    Oversight during the work

    We visit the site while work is under way to confirm the contractor is following the protocol, and we document what we see.

  5. Step 5

    Clearance testing

    When the contractor says the work is done, we inspect and perform post-remediation verification testing against the criteria in the protocol.

You receive the written protocol before work starts and a clearance report at the end with our inspection findings and laboratory results.

Mold Remediation in Portland: common questions

Do you do the mold removal yourselves?
No. Citadel EHS is an independent consultant and does not perform remediation labor. We write the protocol, oversee your contractor and verify the result.
Why not just hire one firm to test and remove?
When one firm writes the scope, does the work and declares it done, there is no independent check. Separating the roles gives you a scope to bid against and a clearance result that is not self-graded.
Can you recommend a Portland remediation contractor?
We write the protocol so that any qualified contractor can bid on the same scope. The choice of contractor stays with you.
What does clearance testing check?
It checks the space against the criteria in the protocol, usually a visual inspection plus sampling. EPA notes that surface sampling may help show whether an area has been adequately cleaned or remediated.
Do we need an asbestos survey before tear-out?
In many Oregon buildings, yes. DEQ requires an accredited inspector’s survey before a renovation, which the rule defines to include replacing or repairing walls, ceilings and flooring. There are exemptions, such as for an owner-occupant doing work inside a single-unit private residence, so confirm your case. Our Portland asbestos testing page covers the survey.
Is this only for large commercial buildings?
No. We work for property managers, facility managers and owners of commercial and residential buildings. The protocol is sized to the job.

Request a consultation

Mold Remediation in Portland, OR

By submitting, you'll also receive our newsletter. You can unsubscribe at any time.

Inquiring about Mold Remediation in Portland