Seattle skyline with the Space Needle in the foreground

Washington

Mold Remediation in Washington: Independent Protocols, Oversight & Clearance

Citadel EHS does not do the removal work. We write the protocol, oversee your contractor and verify the result with clearance testing.

Photo: Evan Clark / Unsplash

What we do, and what we don’t

Plainly: we do not perform remediation labor. No Citadel crew will tear out drywall or set containment in your building. A remediation contractor does the physical work.

We handle the work around it. We assess the damage and the water source, write the protocol and scope of work, compare contractor bids against that scope, oversee the work on site and perform post-remediation verification testing once the contractor reports completion.

Our independence from the contractor is the point. The person judging whether the job is clean is not the person who was paid to clean it.

Remediation oversight across Washington

Washington has no numeric mold limit to clear against, so the protocol has to define clearance before the work starts. We write the criteria, the moisture repair and the order of work into the scope, so the remediation contractor and the plumbing or roofing trade do not undo each other.

The Department of Health guidance and RCW 59.18.060(14) apply statewide. Where the building is residential, the landlord’s mold-information duty applies at every lease signing, and a written scope and verification report give owners and tenants a shared record.

Tear-out is where the regional rules start to differ. Removing walls or ceilings can disturb asbestos-containing materials, and the survey rule depends on the clean air agency. State law puts an inspection duty on the owner before a project that could disturb asbestos. In Puget Sound, a survey by an AHERA building inspector is required before renovation. Spokane Clean Air and the Southwest Clean Air Agency set their own rules.

Our Seattle office handles protocols and clearance in King, Pierce and Snohomish counties and nearby cities. For other parts of Washington, call us and we will scope the work.

Guidance and rules that apply

There is no numeric mold limit to clear against, so remediation follows published guidance. The asbestos rules apply to the renovation that remediation often involves.

  • EPA guidance for commercial buildings

    EPA’s guidance on mold remediation in schools and commercial buildings says to use outside professionals with mold cleanup experience, check their references, and have them follow EPA’s recommendations, ACGIH guidelines or other professional guidelines.

    EPA, Mold Remediation in Schools and Commercial Buildings, Chapter 1
  • ANSI/IICRC S520

    The ANSI/IICRC S520 standard is a procedural standard for the remediation of mold-damaged structures and contents in residential, commercial and institutional buildings. The fourth edition was published in 2024.

    IICRC, ANSI/IICRC S520
  • RCW 59.18.060(14)

    Residential landlords must give new tenants Washington Department of Health information on the health hazards of indoor mold when the lease is signed, or post it in a visible public location.

    Washington RCW 59.18.060
  • RCW 49.26.013

    An owner or owner’s agent who allows a project with a reasonable possibility of disturbing asbestos must have a good faith inspection performed by persons meeting federal accreditation requirements, unless the owner assumes asbestos is present and takes maximum precautions.

    Washington RCW 49.26.013
  • PSCAA Regulation III, Section 4.02

    In King, Kitsap, Pierce and Snohomish counties, a renovation may not be caused or allowed unless the owner or owner’s agent obtains an asbestos survey by an AHERA building inspector. A renovation of an owner-occupied single-family residence does not need an AHERA inspector.

    Puget Sound Clean Air Agency, Regulating Asbestos

How a remediation project runs

  1. Step 1

    Assessment

    We inspect the affected area, find the moisture source and decide how far the work needs to extend.

  2. Step 2

    Protocol and scope

    We write the protocol: the work to be done, how it is contained and cleaned, and the criteria the space must meet to be cleared.

  3. Step 3

    Bid review

    You invite the contractors you want. We help you compare what they offer against the same written scope.

  4. Step 4

    Oversight during the work

    We visit the site while work is under way, check it against the protocol and record what we see.

  5. Step 5

    Clearance testing

    When the contractor reports completion, we inspect and perform post-remediation verification testing against the protocol’s criteria.

You receive the written protocol before the work begins and a clearance report afterwards, with our inspection findings and laboratory results.

Mold Remediation in Washington: common questions

Does Citadel EHS remove the mold?
No. We are an independent consultant, so we write the protocol, oversee the contractor and perform clearance testing, but we do not do the removal ourselves.
Why is independence from the contractor useful?
A contractor that writes the scope and grades its own work has a conflict of interest between the size of the scope and the verdict. When we do neither, the scope and the verification are not tied to the contractor’s revenue.
Do we need an asbestos survey before tear-out in Washington?
Often. State law requires a good faith inspection by the owner or owner’s agent unless asbestos is assumed present. In Puget Sound, Regulation III, Section 4.02 requires a survey by an AHERA building inspector before a renovation, except for an owner-occupied single-family residence. Other agencies have their own rules. Our Washington asbestos page covers them.
Does the survey rule differ between Seattle and Spokane?
Both require a survey by an AHERA-certified building inspector before renovation or demolition, but the notice rules, exemptions and thresholds are written by each agency. Confirm the agency for your county before tear-out.
What does clearance testing check?
It checks the space against the criteria set in the protocol, usually a visual inspection plus sampling. EPA notes that surface sampling may be useful for determining that an area has been adequately remediated.
What if the spore counts are low but the area is still damp?
Treat the moisture as the problem. EPA says moisture control is the key to mold control, and a damp wall cavity can grow mold after a clean sample. Clearance includes confirming that the source is fixed and the materials are dry.

Request a consultation

Mold Remediation in Washington

By submitting, you'll also receive our newsletter. You can unsubscribe at any time.

Inquiring about Mold Remediation in Washington